Alexandra Bridge: Boardwalk and articulation repair project
Budget 2019 provided funding for the rehabilitation and ongoing maintenance of the Alexandra Bridge. While the Alexandra Bridge replacement project continues, Public Services and Procurement Canada is carrying out necessary repair work to keep the bridge in service and safe for users.
On this page
Project overview
- Location
- Gatineau, Quebec, and Ottawa, Ontario
Locate the Alexandra Bridge on a map - Type of project
- Rehabilitation
- Lead department
- Public Services and Procurement Canada
- Project status
- Construction phase
- Construction firm
- Pomerleau Inc.
- Construction cost
- $32.6 million (tax included)
Project description
Detailed inspections concluded that the bridge structure is in poor condition (Studies and reports: Replacing the Alexandra Bridge).
The boardwalk and articulation repair project mainly addresses the safety of the bridge by:
- stabilizing the structure of the bridge
- rehabilitating the boardwalk
The bridge was closed for vehicular traffic from October 2023 to February 2025.
The repair work performed on the bridge structure, including the truss members and the boardwalk lane, will allow the bridge to continue to be used safely until it’s replaced.
Key milestones
- Winter 2022: A request for proposals was issued for construction management to deliver the project
- Spring 2023: The construction management contract was awarded
- Fall 2023: Work began and the bridge was closed to vehicular traffic
- Fall 2024: The boardwalk was reopened to circulation
- Winter 2025: Vehicular access was reinstated
- Summer 2025: Repairs and stabilization work will be completed
Image gallery

Impact on traffic
Off-peak lane closures may be necessary to finalize remaining minor work and to perform inspections and maintenance work.
We’re working with our partners to ensure that plans are in place to minimize disruptions to commuting traffic during the project.
Lane reductions and closures on interprovincial bridges in the National Capital Region
Please note that the load restrictions on the Alexandra Bridge remain in effect with a maximum of:
- 27 tonnes on the vehicular lanes
- 5 tonnes on the boardwalk lane