Backgrounder: Investments paving the way to road and highway upgrades across Newfoundland and Labrador
Backgrounder
The federal government is investing $12,089,157 through the Rural and Northern Communities Infrastructure stream (RNCIS), and $165,044 through the Green Infrastructure stream (GIS) of the Investing in Canada Infrastructure Program, to support 31 highways and roads projects across Newfoundland and Labrador.
Project Information:
Location |
Project Name |
Project Details |
Funding Stream |
Federal Funding |
Provincial Funding |
Municipal Funding |
Bonavista |
Road Upgrades |
Road upgrades and asphalt resurfacing on Old Catalina Road / Mouland’s Lane / Long’s Lane / Brown’s Lane / Red Cove Road / Bake Pot Pond Road / Doody’s Hill / Downey’s Lane |
RNCIS |
$305,362 |
$305,271 |
$305,271 |
Campbellton |
Bob Clark Drive Upgrading (Phase 2) |
Road upgrades and asphalt resurfacing on Bob Clark Drive. |
RNCIS |
$151,150 |
$151,105 |
$151,105 |
Channel-Port aux Basques |
Channel-Port Aux Basques: Grand Bay West Asphalt Removal-Replacement |
Road upgrades and asphalt resurfacing on Grand Bay West. |
RNCIS |
$90,475 |
$90,448 |
$90,448 |
Conception Bay South |
Street Paving and Upgrading |
Road upgrades and asphalt resurfacing on 4 km of roadway in Conception Bay South. |
RNCIS |
$662,349 |
$662,150 |
$662,150 |
Corner Brook |
Retaining Wall Curling Street |
Replacement of the aging retaining wall located at Curling Street |
RNCIS |
$453,508 |
$453,372 |
$453,372 |
Corner Brook |
Deep Gulch Brook Culvert Replacement |
Replacement of the existing culvert, new asphalt, curb & gutter, sidewalk, traffic island, and reinstatement. |
RNCIS |
$816,315 |
$816,070 |
$816,070 |
Daniel's Harbour |
Road Upgrading - Circular Road and Depot Road |
Road upgrades and asphalt resurfacing on Circular Road and Depot Road. |
RNCIS |
$37,792 |
$37,781 |
$37,781 |
Glovertown |
Glovertown Road Upgrades |
Road upgrades and asphalt resurfacing on two local roads in Glovertown. |
RNCIS |
$157,359 |
$157,311 |
$157,311 |
Grand Bank |
Paving Program - Blackburn Street |
Road upgrades and asphalt resurfacing on Blackburn Street. |
RNCIS |
$29,289 |
$29,281 |
$29,281 |
Happy Valley-Goose Bay |
Road Reconstruction - Loring Drive |
Road upgrades and asphalt resurfacing on Loring Drive. |
RNCIS |
$115,090 |
$115,056 |
$115,056 |
Happy Valley-Goose Bay |
Road Intersection Upgrades on Hamilton River Road |
Upgrading of intersections on Hamilton River Road including installation of proper signalization, turning lanes and road realignment. |
RNCIS |
$166,286 |
$166,236 |
$166,236 |
Harbour Breton |
Causeway Bridge Rehabilitation |
Rehabilitation of the Causeway Bridge connecting the 2 sides of Harbour Breton |
RNCIS |
$400,599 |
$400,479 |
$400,479 |
Hermitage-Sandyville |
Upgrade of Various Local Roads |
Road upgrades and asphalt resurfacing on 2.2 km of roads. |
RNCIS |
$162,991 |
$162,942 |
$162,942 |
Humber Arm South |
Hayward Road Paving |
Road upgrades and asphalt resurfacing on Hayward Road. |
RNCIS |
$30,004 |
$29,995 |
$29,995 |
Isle aux Morts |
Cotter's Road / Bush Point Road Upgrades |
Road upgrades and asphalt resurfacing on Cotter’s Road / Bush Point Road. |
RNCIS |
$91,306 |
$91,279 |
$91,279 |
Isle aux Morts |
Cemetery Road Upgrades |
Road upgrades and asphalt resurfacing on Cemetery Road. |
RNCIS |
$17,536 |
$17,530 |
$17,530 |
Labrador City |
Street Reconstruction 2022 - Drake Avenue and Bartlett Avenue |
Road upgrades and asphalt resurfacing on Drake Avenue and Bartlett Avenue. |
RNCIS |
$606,009 |
$605,828 |
$605,828 |
L'Anse au Loup |
Town Road Paving (Phase 2) |
Road upgrades and asphalt resurfacing on 3 km of road. |
RNCIS |
$164,685 |
$164,635 |
$164,635 |
Marystown |
Glendon Brook Bridge Replacement |
Rehabilitation of the Glendon Brook Bridge by installing a new modular bridge system or structural plate bridge. |
RNCIS |
$117,897 |
$117,861 |
$117,861 |
Musgravetown |
2023 Northwest Road Rehabilitation |
Road upgrades and asphalt resurfacing on Northwest Road. |
RNCIS |
$181,190 |
$181,135 |
$181,135 |
Pacquet |
Paving By-roads |
Road upgrades and asphalt resurfacing on 2 by-roads. |
RNCIS |
$54,950 |
$54,933 |
$54,933 |
Paradise |
Neary Road Culvert Improvements |
Replacing existing stormwater infrastructure on Neary Road. |
GIS |
$165,044 |
$123,783 |
$123,783 |
Paradise |
Kenmount Road Upgrading Phase 1 |
Design and construction of approximately 555m of roadway, including sidewalk, curb and gutter on Kenmount Road. |
RNCIS |
$1,083,725 |
$1,083,400 |
$1,083,400 |
Port au Choix |
New Sidewalks Various Road Locations |
Installation of sidewalk on three major roads Point Riche Rd , Farwells Dr. and Gagamelle |
RNCIS |
$138,259 |
$138,218 |
$138,218 |
Reidville |
Upgrade and Pave Old Rocky Brook Road |
Ditching, replacing culverts and paving on Old Rocky Brook Road. |
RNCIS |
$185,982 |
$185,926 |
$185,926 |
Rocky Harbour |
Shears Village Lane and Parsons Lane Paving |
Road upgrades and asphalt resurfacing on Shears Village Lane and Parsons Lane. |
RNCIS |
$110,416 |
$110,383 |
$110,383 |
Spaniard's Bay |
Road Reconstruction and Paving - Rectory Avenue/Casey's Lane |
Road upgrades and asphalt resurfacing on Rectory Avenue and Casey’s Lane. |
RNCIS |
$420,253 |
$420,127 |
$420,127 |
St. Joseph's |
Lower Road Rehabilitation |
Repairs and addition of erosion control to the Lower Main Road |
RNCIS |
$40,773 |
$40,760 |
$40,760 |
Steady Brook |
Upgrade and Pave Marble Drive |
Road upgrades and asphalt resurfacing on Marble Drive. |
RNCIS |
$137,516 |
$137,475 |
$137,475 |
Trepassey |
Road Rehabilitations - Routes 10 and 211 |
The project includes pavement rehabilitation on sections of Route 10 between Chance Cove Park and Trepassey and rehabilitation of the arch culver situated on Route 211 near English Harbour (at Loo Pond). |
RNCIS |
$4,625,000 |
$4,625,000 |
$0 |
Wabush |
Road Reconstruction - 2nd Avenue |
Road upgrades and asphalt resurfacing on 2nd Avenue. |
RNCIS |
$535,092 |
$534,932 |
$534,932 |
Page details
- Date modified: