Enhanced Fujita scale damage indicators and degrees of damage, chapter 21


Metal Building Systems (MBS)

Typical Construction:

Table 21. Degree of Damage (DOD) for Expected (EXP), Lower Bound (LB) and Upper Bound (UB)
DOD Damage Description EXP* LB* UB*
1 Threshold of visible damage 110 85 135
2 Inward or outward collapse of overhead doors 145 120 175
3 Metal roof or wall panels pulled from the building 155 125 195
4 Column anchorage failed 190 155 215
5 Buckling of roof purlins 190 155 220
6 Failure of cross-braces in the lateral load resisting system 220 190 255
7 Progressive collapse of rigid frames 230 195 270
8 Total destruction of building 250 210 285

*All wind speeds in km/h

Page details

Date modified: